The following reports have their required user access level listed beside each one:
| WIP Report |
This report shows all the jobs and the work done on that job for the period selected. |
Level 6 |
| WIP Report II |
This report shows all the jobs and the work done on that job including cost estimates (based on hours * staff rates) and disbursement costs for the period selected. |
Level 6 |
| WIP II Client Report |
This report shows all the jobs and the work done on that job including cost estimates (based on hours * staff rates) and disbursement costs for the period selected. |
Level 6 |
| WIP II Summary Report |
This report shows all the jobs and the work done on that job including cost estimates (based on hours * staff rates) and disbursement costs for the period selected. |
Level 6 |
| Project Variance Report |
This report shows differences between the invoice numbers and the calculated time and disbursement values. |
Level 6 |